Skip to content
GembaDocs

Lean Cave

  • Topics
    • Customer Stories
    • Irish Lean Tours
    • Lean
    • GembaDocs Updates
    • GembaTalk
    • SOPs and Kanban
    • Useful stuff!
    • Submit Content
  • Cave
    • Books
    • Courses
    • Events
    • Guides
    • Lean Scorecard
    • Podcasts
    • Tools
    • Videos
  • Topics
    • Customer Stories
    • Irish Lean Tours
    • Lean
    • GembaDocs Updates
    • GembaTalk
    • SOPs and Kanban
    • Useful stuff!
    • Submit Content
  • Cave
    • Books
    • Courses
    • Events
    • Guides
    • Lean Scorecard
    • Podcasts
    • Tools
    • Videos
  • Login
  • Login
Get Started
GembaDocs Logo Main Square

Lean Cave

  • Login
  • Login
  • Topics
    • Customer Stories
    • Irish Lean Tours
    • Lean
    • GembaDocs Updates
    • GembaTalk
    • SOPs and Kanban
    • Useful stuff!
    • Submit Content
  • Cave
    • Books
    • Courses
    • Events
    • Guides
    • Lean Scorecard
    • Podcasts
    • Tools
    • Videos
  • Topics
    • Customer Stories
    • Irish Lean Tours
    • Lean
    • GembaDocs Updates
    • GembaTalk
    • SOPs and Kanban
    • Useful stuff!
    • Submit Content
  • Cave
    • Books
    • Courses
    • Events
    • Guides
    • Lean Scorecard
    • Podcasts
    • Tools
    • Videos
GembaDocs Logo Main Square

Lean
Cave

  • Topics
    • Customer Stories
    • GembaDocs Updates
    • Lean
    • SOPs and Kanban
    • Useful stuff!
  • Cave
    • Books
    • Courses
    • Guides
    • Podcasts
    • Videos
  • Login
  • Get Started
  • Topics
    • Customer Stories
    • GembaDocs Updates
    • Lean
    • SOPs and Kanban
    • Useful stuff!
  • Cave
    • Books
    • Courses
    • Guides
    • Podcasts
    • Videos
  • Login
  • Get Started
  • Login
  • Login

Buell Lean Tour: Going from 2 to 50 bikes, daily

Tour Buell Motorcycles' Michigan factory scaling from 2 to 50 bikes daily using digital lean manufacturing, Kanban systems, and American-made components.
  • 7 November 2025
  • GembaDocs HQ

There’s something special happening in Michigan. At Buell Motorcycles, a legendary American brand is being reborn, not just as a motorcycle manufacturer, but as a showcase for modern lean manufacturing done right.

We recently had the privilege of touring their facility, and what Tom witnessed was far more than an assembly line. It was a masterclass in how to scale production intelligently, combining time-tested lean principles with cutting-edge digital tools to tackle one of manufacturing’s toughest challenges: growing from 2 motorcycles per day to 50.

The Super Cruiser production line tells a compelling story about American manufacturing’s resurgence. 

From engine casings to frames, critical components are being brought back to domestic soil. But what really caught my attention wasn’t just the “Made in USA” story—it was how they’re building the operational foundation to make that promise sustainable.

Take a walk through the facility in our video, where we see Kanban cards on inventory bins, visual management boards tracking daily tasks, and QR codes on every workstation linking to digital standard operating procedures. This isn’t your grandfather’s motorcycle factory. It’s a blueprint for how American manufacturing can compete in the 21st century.

Tour Breakdown

1. Digital SOPs Eliminate Friction in Rapid Development

One of the most impressive implementations at Buell is their use of QR code-accessible digital SOPs at every workstation. Here’s why this matters:

  • The Problem They Solved: When you’re scaling production 25x and simultaneously refining your processes, printed procedures become obsolete almost immediately. Every process improvement meant reprinting, redistributing, and managing version control across the facility.
  • Their Solution: By deploying GembaDocs with QR codes at each station, workers always access the latest version. When the engineering team updates a procedure, it’s instantly available across the entire facility. No printing. No confusion. No working from outdated instructions.
  • The Impact: This eliminates a massive source of friction in continuous improvement. Teams can iterate on processes daily without the administrative overhead of document control. For a growing company, this is transformative.

2. Onboarding at Scale Requires Systematic Documentation

Buell faces a challenge common to growing manufacturers: they need to rapidly onboard new team members while maintaining quality standards. Their approach is methodical:

  • 500+ documented procedures and Kanbans covering everything from bearing purchasing to engine testing
  • Step-by-step visual work instructions for complex processes like engine case assembly
  • Standardized training paths that ensure consistency across all new hires

When you’re building two bikes per day, tribal knowledge might work. At 50 bikes per day, you need systems. Buell is building those systems now, before they scale, which is the smart play.

Buell Motorcycles

3. Visual Management Creates Transparency

The facility showcases excellent visual management practices:

  • Kanban boards with red/green status cards for inventory management
  • Morning meeting boards with daily, weekly, and monthly task tracking
  • Inventory transaction stations with clear protocols for card placement
  • Work area organization including 5S principles (empty trash bins as visual indicators)

 

What impressed us most was how these weren’t just “lean theater”-these were working systems actively used by the team. The Kanban implementation is still evolving (they’re testing different card placement methods), which shows they’re treating lean as a journey, not a destination.

4. Customer Feedback Drives Product Evolution

The prototype progression tells a powerful story about customer-centric development. Across iterations of the Super Cruiser, you can see substantial changes:

  • Exhaust system: Complete redesign of routing and layout
  • Frame geometry: Modified for improved riding dynamics
  • Seat height and riding position: Adjusted based on direct customer feedback from events
  • Suspension tuning: Collaboration with Fox Suspension for customization options

This iterative approach, bringing bikes to events, gathering feedback, engineering improvements – demonstrates a commitment to building what customers actually want, not just what looks good in CAD.

5. The American Manufacturing Opportunity

Perhaps the most significant takeaway is Buell’s commitment to domestic manufacturing:

  • Engine casings: Now made in the USA
  • Frames: Manufactured domestically
  • Critical components: Systematically being reshored

 

This isn’t just patriotic marketing. There’s a real competitive advantage in having your supply chain closer to your engineering team. When you’re iterating rapidly (as Buell clearly is), having suppliers you can visit, work with directly, and coordinate with on short timelines is invaluable.

The strong local manufacturing community – evidenced by the FAT American Manufacturing poster on their wall (shows there’s a growing ecosystem of companies supporting each other locally). This is how manufacturing regions rebuild.

6. Smart Scaling Means Building Systems Before You Need Them

The most important lesson from Buell isn’t any single tool or technique-it’s their approach to scaling. They’re not waiting until they hit capacity to build better systems. They’re implementing:

  • Digital work instructions while procedures are still evolving
  • Visual management while the team is still small enough to communicate informally
  • Kanban systems while inventory is still manageable without them

 

Build the foundation for 50 bikes per day while you’re still making 2. By the time you hit scale, the systems are mature, debugged, and second nature to your team.

Takeaways

Key Takeaways for Manufacturing Leaders:

The Buell Motorcycles story is ultimately about intelligent growth. It’s a reminder that scaling manufacturing isn’t just about buying more equipment or hiring more people-it’s about building systems that make quality and efficiency repeatable.

For anyone in manufacturing looking to scale operations, Buell offers a clear playbook:

  • Digitize your SOPs early
  • Implement visual management before you think you need it
  • Document everything while it’s fresh
  • Iterate on processes continuously
  • Build relationships with local suppliers
Previous

Related Posts

Seating Matters Kanban Tour: Total Ownership and Visual Control

This well-developed Kanban system ensures materials arrive on time, prevents stockouts, and allows anyone, even visitors, to understand inventory status

Read on..
Seating Matters Lean Tour

Seating Matters Full Lean Tour – 25 Mins, 30 Insights!

World-class lean factory, revealing how visual management, total ownership, and aesthetic attention create a calm, productive workplace where employees genuinely

Read on..

Lean Cave

Video Enabled

Videos

Courses

Courses

Guides

Guides

Books

Books

Podcast

Podcasts

Empower your workforce with GembaDocs

Get started
GembaDocs
SOC GembaDocs

Platform support: Visit our support hub

General enquiries: Get in touch with us through our form, or email hello@gembadocs.com

Get it on Google
Get it on Apple

Lean Cave News

Sign up for lean news, Gemba insights and general updates from GembaDocs

Icon-instagram-1 Linkedin Youtube
  • Login
  • Compare GembaDocs
  • Privacy Policy
  • Terms and Conditions
  • Login
  • Compare GembaDocs
  • Privacy Policy
  • Terms and Conditions

All Rights Reserved © 2025 GembaDocs Limited | AI scraping, cloning, or training prohibited | Registered in Northern Ireland NI713726 ​

GembaDocs is powered by Sustainable Energy